Description

Description

Description

Rear LED Light Units – With Reflector and Long Lead : L5218W

Description

A complete LED light unit, with great looks and slim line LED patterns, this looks very modern. It’s quite large, with a thick and durable front lens and coloured inners.

What’s great about these light units is that they not only look good, and are quite slim, but they have ambient running lights. These lights basically form two glowing sections on the top corners (See pictures).

As with all of our LED rear lighting products, this light unit comes with a 24 month warranty on functionality and bulbs! Ensuring peace of mind and a secure investment.

 

Reference:L5218W (LEFT N/S) – L5219W (RIGHT O/S)
Base Colour:Black
Lens Colour:Clear & Red (With Coloured Inner Body)
Dimensions:350x81x131mm (LxWxH)
Bulb Type:LED
Power Voltage:12 or 24v
Wiring Type:Pre-soldered Wires
Regulations:E20 Regulation 10
Warranty:24 Months Including Bulbs
Applications:Artic Units, LGVs, Motorhomes and Trailers
Bolt Thread Thickness:8mm (M8)
Bolt Distance:150mm
Notes:

Warranty

All of our LED Rear Light Units come with a 24 month warranty which starts from the moment of receipt.

The warranty covers you for electrical failure, but also, blown bulbs (if LED). That means that for two years, you never have to have a truck with a defective rear light unit, or having to put up with a blown bulb! If a bulb blows, you can simply return it to us and we’ll replace it!

See our warranty page for more information.

Additional information

Additional information

Additional information

WeightN/A
Fitment

LEFT (N/S), RIGHT (O/S)

Reviews (0)

Reviews (0)

Reviews

There are no reviews yet.

Only logged in customers who have purchased this product may leave a review.